NORTH CAROLINA GENERAL ASSEMBLY

1969 SESSION

 

 

CHAPTER 755

HOUSE BILL 19

 

 

AN ACT TO MAKE APPROPRIATIONS TO PROVIDE CAPITAL IMPROVEMENTS FOR STATE INSTITUTIONS, DEPARTMENTS, AND AGENCIES.

 

The General Assembly of North Carolina do enact:

 

Section 1.  This Act shall be known as "The Capital Improvement Appropriation Act of 1969".

Sec. 2.  The funds appropriated by this Act are for the purposes of constructing buildings and utilities, the renovation of buildings and utilities, acquiring sites therefor where necessary, acquiring and installing equipment at the institutions, departments and agencies of the State hereinafter mentioned, and only as detailed in Volume III of the 1969-71 Budget.

Sec. 3.  The funds appropriated by this Act to provide for Capital Improvements by Sections 4, 5, and 6 of this Act shall be disbursed for the purposes provided by this Act upon warrants drawn by the State Disbursing Officer, which warrants shall not be drawn for any State institution, department, or agency until a requisition has been approved by the Director of the Budget and which requisition shall be approved only after full compliance with the Executive Budget Act, Article 1, Chapter 143, of the General Statutes. Any officer of this State or executive head of any institution, or any director, trustee, or commissioner of any State institution, department, or agency to which an appropriation is made under the provisions of this Act who votes for or aids in spending more money for any improvement for any institution, department, or agency than is appropriated therefor may be removed from office by the Governor. Any additional monies which may be received by means of a grant or grants from the United States of America or any agency or department thereof, or from any other source to aid in financing the cost of any of the improvements herein referred to may be placed by the State Treasurer in the same fund or in a separate fund and, to the extent permitted by terms of such grant or grants, with the approval of the Governor and the Advisory Budget Commission, shall be disbursed in the same manner and for the same purposes mentioned in this Act, and only as detailed in Vol. III of the 1969-71 Budget. Appropriations and authorizations for student housing are on the basis of three thousand nine hundred dollars ($3,900) per student and shall not exceed this per student cost for the stated project including equipment and furnishings. College housing authorized to be constructed by self-liquidating funding in Section 4 of this Act shall have been recommended by the Advisory Budget Commission as to need and as to method of financing before construction may be started. Where funds are shown in this Act for the purpose of furnishing equipment for any project, such funds for equipment shall not be subject to transfer into construction accounts except as authorized by the Advisory Budget Commission. However, equipment funds may be expended under construction accounts to the specific amount required for fixed equipment attached or connected to the building for which it is intended. It is the intent of this Act that projects listed herein shall be completed, including fixed and movable equipment and furnishings, within the limits of the amounts of funds appropriated or authorized herein.

Sec. 4.  There is hereby appropriated out of the General Fund the sum of seventy four million four hundred sixty two thousand five hundred and three dollars ($74,462,503) for the use of the State institutions, departments and agencies to provide for CAPITAL IMPROVEMENT projects according to the following schedule:

 

I. GENERAL GOVERNMENT

 

Department of Administration…………                                                                        $15,110,500

1. New Boiler and Accessories

Central Heating Plant……….                                                        $ 250,000

2. General Renovations of Buildings….                                                 125,000

3. Complete Fence at the Governor's

Mansion…………………………….                                               70,000

4. Additional Office and Laboratory

Facilities for the State Board of

Health Building…………………….               $ 3,620,000

Fixed Equipment…………………..                     230,000

Movable Equipment……………….                        50,000          3,900,000

5. Purchase of Land……………………                6,171,000

Less Federal Funds…………………                   230,500           5,940,500

6. Renovate and Air Condition Facilities

of the Sanatorium System………….                                             1,825,000

7. Museum of Art………………………              10,000,000

Less Private Gifts……………………                7,000,000           3,000,000

 

III. CORRECTION

Stonewall Jackson Training School……….                                                                          320,000

1. Guttering and Roof Repairs on 17

Cottages and Administration

Building……………………………                                                 60,000

2. Convert Boilers from Coal to Gas…                                                $ 22,000

3. Laundry Building

Building……………………………                     $ 50,000

Fixed Equipment………………….                         35,000

Movable Equipment………………                            5,000              90,000

4. Renovate Cottage No. 17

Building……………………………                        46,000

Equipment…………………………                          2,000               48,000

5. Supplement to Sewage

Disposal Plant……………………..                                                100,000

 

State Home and Industrial School for Girls…                                                                      $ 89,000

1. Convert Boilers from Coal to Oil…                                                    19,000

2. Reroof Nine Buildings……………                                                    25,000

3. Renovate Water Treatment Plant…                                                    25,000

4. Complete Electrical Distribution

and Street Lights…………………                                                    20,000

 

Morrison Training School………………….                                                                       437,000

1. Convert Boilers from Coal to Oil…                                                    19,000

2. Renovate Electrical Wiring and

Plumbing in Teacher's Cottage……                                                     5,000

3. Superintendent's Residence

Building……………………………                         19,000

Fixed Equipment…………………..                               500            19,500

4. New Windows in Redd Cottage……                                                  7,500

5. Cottage for 48 Students and 6 Staff Members

Building……………………………                      365,000

Movable Equipment………………                          15,000             380,000

6. Additional Freezer Space………….                                                     6,000

 

Eastern Carolina Training School……………                                                                      117,000

1. Convert Boiler from Coal to Oil….                                                        5,000

2. Study Desks and Chest of Drawers Units                                              6,000

3. Trench Silo for Beef Cattle……….                                                       6,000

4. Infirmary

Building……………………………                        85,000

Movable Equipment……………….                        15,000             100,000

 

State Training School for Girls………………                                                                        61,500

1. Convert Boilers from Coal to Oil….                                                      9,000

2. Study Desks and Chest of Drawers Units                                              2,500

3. Connect Sewer to City Sewer System…                                              50,000

 

Leonard Training School………………………                                                               $ 411,000

1. Academic and Vocational School Building

Building………………………………                 $ 330,000

Movable Equipment………………….                       20,000         $ 350,000

2. Paved Area for Multipurpose Use……                                                   6,000

3. Maintenance Shop Annex Building….                         50,000

Movable Equipment…………………                          5,000              55,000

 

Juvenile Evaluation Center…………………                                                                     1,102,000

1. Two Cottages to House

48 Students Each Building………….                       682,000

Movable Equipment…………………                        28,000            710,000

2. Cafeteria

Building………………………………                    312,000

Fixed Equipment…………………….                       65,000

Movable Equipment…………………                        15,000            392,000

 

C.A. Dillon School……………………………                                                                    75,000

1. All Weather Surfaced Walks and Drives                                              50,000

2. Campus Lighting………………………                                              25,000

 

Department of Correction……………………                                                                     500,000

1. Reserve for Existing Facilities…………                                              500,000

 

V. EDUCATION

 

University of North Carolina (Consolidated)                                                                         875,000

1. Headquarters Building for

Consolidated Offices…………………                                             825,000

2. Three UHF Television Translator Stations                                             50,000

 

University of North Carolina at Chapel Hill (Health Affairs)                                               13,021,921

1. Utilities and Site Improvements………                                               438,000

2. Replace Boiler, Main Steam Plant……                                            1,500,000

3. Medical Examiners Laboratory

(Addition to Preclinical Facility)

Building………………………………                    635,000

Fixed Equipment……………………                         75,000

Movable Equipment…………………                        10,000                                    720,000

4. Animal Care Facility (Research

Animal Farm) — School of Medicine

Building……………………………….                    247,000

Fixed Equipment………………………                     15,000

Movable Equipment…………………                         20,000             282,000

5. Chapel — North Carolina Memorial Hospital

Building…………………………….                        230,000

Fixed Equipment……………………                         15,000

Movable Equipment…………………                           8,000

                                                                                            253,000

Less Gifts…………………………….                  $ 253,000                      -0-

6. Preclinical Education Facilities

Building………………………………                  3,646,000

Fixed Equipment…………………….                       903,000

Movable Equipment…………………                        340,000

                                                                                         4,889,000

Less Federal Funds…………………..                  2,352,755        $ 2,536,245

7. Clinical Sciences Building —

School of Medicine

Building………………………………                  7,800,000

Fixed Equipment…………………….                       500,000

Movable Equipment………………….                      600,000

                                                                                         8,900,000

Less Federal Funds……………………                4,329,402           4,570,598

8. Bed Tower Addition to North

Carolina Memorial Hospital Building…                   5,200,000

Fixed Equipment………………………                    200,000

Movable Equipment……………………                   570,000

                                                                        5,970,000

Less Federal Funds…………………….               2,994,922           2,975,078

 

University of North Carolina at

Chapel Hill (Academic Affairs)………………                                                                  $ 844,000

1. Utilities and Site Improvements                                                              844,000

2. Special Collections Library Building

Building………………………………                  2,525,000

Fixed Equipment…………………….                       200,000

Movable Equipment………………….                      200,000

                                                                                         2,925,000

Less Private Gifts…………………….                   2,925,000                       -0-

 

North Carolina State University at Raleigh                                                                         2,836,000

1. Building Repairs, Utilities and

Improvements……………………….                                               1,816,000

2. Renovate Cobalt — 60 Source………                                                   25,000

3. Supplement to Nuclear Science

Building………………………………                                                945,000

4. Elevator for General Laboratory

Building………………………………                                                  50,000

 

University of North Carolina at Greensboro                                                                       $ 455,000

1. Renovation and Extension of Campus

Utilities and New Campus Lighting

System………………………………….                 $ 200,000

2. Language Laboratory……………………                      55,000

3. Relocate Utilities and Streets for

Library Addition……………………….                      200,000

 

University of North Carolina at Charlotte…….                                                                     955,000

1. Campus Improvements…………………                                                 25,000

2. Addition to Language Laboratory………                                                 70,000

3. Expansion of Utilities………………….                                                  295,000

4. Roads, Walks and Parking

Parking Areas…………………………                    $ 275,000

Less Self-Liquidating…………………                        275,000                    -0-

5. Union Building Expansion

Building……………………………….                    1,330,000

Fixed Equipment………………………                        80,000

Movable Equipment……………………                      120,000

                                                                           1,530,000

Less Self-Liquidating………………….                    1,530,000                    -0-

6. Health Services Center

Building………………………………                        405,000

Movable Equipment………………….                           60,000              465,000

7. Outdoor Physical Education Fields……                                                   100,000

8. Dormitories for 1,000 Students

Building……………………………….                    3,730,000

Movable Equipment…………………..                        170,000

                                                                           3,900,000

Less Self-Liquidating…………………                     3,900,000                    -0-

 

East Carolina University………………………                                                                2,534,000

1. Air Condition Graham Classroom

Building……………………………….                                               90,000

2. Renovate Electrical Distribution

System…………………………………                                            200,000

3. Renovate Storm Sewer System…………                                            216,000

4. Supplement to Elementary Education

Laboratory School……………………                                              400,000

5. Eight All Weather Tennis Courts…….                                                   55,000

6. Student Union

Building……………………………….                   2,640,000

Fixed Equipment………………………                     160,000

Movable Equipment……………………                    145,000

                                                                           2,945,000

Less Self-Liquidating………………….                 $2,945,000                    -0-

 

7. Relocate Utilities and Streets

for Library Addition……………………                                           $ 200,000

8. Building for School of Allied

Health Professions Building……………                   1,188,000

Fixed Equipment……………………….                    115,000

Movable Equipment……………………                       70,000         1,373,000

 

North Carolina Agricultural and Technical

State University                                                                                                              $ 1,018,000

1. Renovate Noble Hall

Building…………………………………                   190,000

Equipment………………………………                     30,000             220,000

2. Renovate and Air Condition Graham Building

Building…………………………………                 252,000

Equipment………………………………                  46,000              298,000

3. Alteration and Expansion of Primary

Electrical System……………………….                                             500,000

4. Renovate Scott Hall (Dormitory)

Building……………………………….                      35,000

Less Self-Liquidating………………….                      35,000                      -0-

5. Renovate New Vanstory Hall (Dormitory)

Building……………………………….                      45,000

Less Self-Liquidating………………….                      45,000                      -0-

6. Faculty and Married Student Housing

Building…………………………………                 260,000

Movable Equipment……………………                     30,000

                                                                             290,000

Less Self-Liquidating……………………                 290,000                      -0-

7. Cafeteria Facility

Building…………………………………              1,300,000

Fixed Equipment……………………….                   150,000

Movable Equipment……………………                   150,000

                                                                                          1,600,000

Less Self-Liquidating…………………                  1,600,000                      -0-

 

Western Carolina University                                                                                              1,522,000

1. Water Storage Reservoir…………………                                         175,000

2. Fire and Ladder Trucks…………………                                             50,000

3. Alterations to Electrical

Distribution System………………….                                                250,000

4. Addition to Sewage Treatment Plant…                                             $ 500,000

5. Walks, Drives and Landscaping………                                                 50,000

6. Faculty Housing Building…………….                    $ 437,000

Equipment…………………………….                         5,000

                                                                                             442,000

Less Self-Liquidating…………………                      442,000                     -0-

7. One 600 Student Dormitory

Building………………………………                  2,240,000

Equipment……………………………                     100,000

                                                                          2,340,000

Less Self-Liquidating…………………                  2,340,000                      -0-

8. Addition to Bird Administration

Building…………………………………                 320,000

Movable Equipment……………………                     15,000             335,000

9. Addition to Infirmary

Building……………………………….                      85,000

Fixed Equipment……………………….                      4,000

Movable Equipment……………………                     13,000             102,000

10. Surfacing New Tennis Courts………….                                               60,000

 

Appalachian State University…………………                                                              $ 5,278,000

1. Expansion of Campus Water System…                                           2,180,000

2. Expansion of Steam Generating and

Distribution System………………….                                            1,400,000

3. Equipment for Industrial Arts

Building………………………………                                               68,000

4. Air Condition Office Space in

Duncan Hall……………………………                                            50,000

5. Building Repairs………………………                                             210,000

6. Outdoor Campus Lighting……………                                                25,000

7. Trash Handling Equipment……………                                               25,000

8. Eight Tennis Courts……………………                                              70,000

9. Campus Development

Parking Areas………………………….                    75,000

Less Self-Liquidating………………….                      75,000                     -0-

 

10. Food Service Facility

Building……………………………….                 1,755,000

Fixed Equipment………………………                    150,000

Movable Equipment……………………                   175,000

                                                                          2,100,000

Less Self-Liquidating………………….                 2,100,000                    -0-

11. New Elementary School

for Watauga County……………………                                       1,250,000

 

Pembroke State University                                                                                                2,427,000

1. Health and Physical Education

Building and Swimming Pool

Building………………………………                 $2,140,000

Fixed Equipment…………………….                        70,000

Movable Equipment………………….                        80,000        2,290,000

2. Storm Sewers and Campus Drainage…                                               17,000

3. Campus Roads and Parking Area

Roads…………………………………                     30,000

Parking Area………………………….                      11,000

                                                                                               41,000

Less Self-Liquidating…………………                       11,000            30,000

4. Renovate Jacobs and Wellons

Halls for Women………………………                   105,000

Less Self-Liquidating………………….                    105,000                   -0-

5. Physical Education and

Athletic Field Improvements………….                                               90,000

 

Winston-Salem State College…………………                                                                   605,000

1. Addition to Library

Building……………………………….                    340,000

Movable Equipment………………….                        60,000           400,000

2. Renovate Carolina Hall……………….                                              150,000

3. Air Condition Administration Building                                                   55,000

 

Elizabeth City State College…………………….                                                                 158,000

1. Replace portions of Sanitary

Sewer System……………………………                                          7,000

2. Completion of Athletic Field……………                                              8,000

3. Air Condition Classroom Building………                                            28,000

4. Bedroom Wing Addition to

President's Home…………………………                                        15,000

5. Renovate Lane Hall for Classrooms………                                        100,000

 

Fayetteville State College…………………………                                                             287,500

1. Roads, Walks and Street Lighting…………                                        90,000

2. Pedestrian Railroad Underpass……………                                        75,000

3. Extend sewer to East Campus…………….                                         15,500

4. Extend Electrical Service to

East Campus………………………………                                       17,000

5. Closed Circuit Television System…………                                         90,000

 

North Carolina Central University………………                                                              $ 995,000

1. Chemistry Building Completion

Building…………………………………              $ 160,000

Fixed Equipment………………………                    170,000

Movable Equipment……………………                      10,000       $ 340,000

2. Renovate Science Building

Building…………………………………                 410,000

Movable Equipment…………………….                    15,000           425,000

3. Replace Underground Steam Line………                                            30,000

4. Repairs to Chidley Hall Bathrooms

Building…………………………………                   50,000

Less Self-Liquidating……………………                   50,000                     -0-

5. Athletic Field

Improvements………………………….                   800,000

Less Self-Liquidating………………….                    800,000                    -0-

6. Communications Building

Building……………………………….                 1,650,000

Fixed Equipment………………………                    140,000

Movable Equipment……………………                     60,000

                                                                                          1,850,000

Less Deferred Funds…………………….             1,000,000

Less Federal Funds………………………               650,000             200,000

 

University of North Carolina at Asheville………                                                                   434,000

1. Renovate Science Building

Building…………………………………                   40,000

Equipment………………………………                   10,000               50,000

2. Extend Underground Electrical

Distribution System……………………                                               75,000

3. Complete Unfinished Portion of Library

Building…………………………………                   65,000

Equipment……………………………….                  25,000              90,000

4. Infirmary

Building………………………………….                189,000

Movable Equipment……………………                     30,000             219,000

University of North Carolina at Wilmington                                                                           962,000

1. Expansion of Campus Water and

Sewer System……………………………                                         258,000

2. Complete Underground Primary

Electrical Distribution System…………                                                75,000

3. Renovate Present Library Space

Building…………………………………                   30,000

Equipment………………………………                   20,000               50,000

4. Walkways……………………………….                                            10,000

5. Natural Gas Main…………………………                                          15,000

6. Physical Education Playing

Field Fencing……………………………                                         $ 30,000

7. One 200 Student Dormitory

Building…………………………………              $ 720,000

Movable Equipment…………………….                    60,000

                                                                                             780,000

Less Self-Liquidating……………………                  780,000                   -0-

8. Business and Economics Building

Building…………………………………                 380,000

Equipment………………………………                 100,000           480,000

9. Air Condition and Renovate President's Home

                                                                                                                       44,000

 

North Carolina School for the Deaf…………….                                                              $ 327,500

1. Convert Boiler No. 2……………………                                           15,000

2. Vocational Building

Building and Equipment……………….                                             300,000

3. Supplement to Outside Electrical

Distribution System……………………                                              12,500

 

Department of Archives and History………….                                                                      25,000

1. Exhibits for Chronological History

and Transportation Sections

Archives-Library Building………………                                             25,000

 

North Carolina School of the Arts……………….                                                               482,000

1. Renovate Theatre Facilities Building…….                   260,000

Fixed Equipment…………………………                 10,000

Movable Equipment………………………                 30,000           300,000

2. Renovate Former Kitchen and

Dining Hall

Building……………………………………               120,000

Movable Equipment……………………….                 12,000           132,000

3. Enclose Stairways and Install

Firedoors……………………………………                                     10,000

4. Buildings and Grounds Maintenance Shop

Building……………………………………                36,000

Movable Equipment……………………….                   4,000              40,000

 

VII. NON-HIGHWAY TRANSPORTATION

 

State Port Authority………………………………                                                          4,650,000

1. Open Berth — Wilmington Port                                                        4,650,000

 

VIII. HEALTH AND HOSPITALS

 

Medical Care Commission…………………………                                                           789,082

1. Aid to Community Mental

Health Centers………………………………                                    545,082

2. Aid to Community Mentally

Retarded Facilities……………………………                                   244,000

 

Department of Mental Health……………………….                                                        $ 500,000

1. Aid to Community Mentally

Retarded Complexes…………………………                                $ 500,000

 

Alcoholic Rehabilitation Center — Greenville                                                                         15,000

1. Air Conditioning Equipment……………….                                          15,000

 

Dorothea Dix Hospital…………………………….                                                          3,095,000

1. Improvements and Addition to

McBryde Building

Building and Air Conditioning……………               $ 775,000

Movable Equipment………………………                125,000           900,000

2. Power Plant Improvements…………………                                      160,000

3. Air Condition and Improve Cherry Building

Building and Air Conditioning…………….                 435,000

Movable Equipment…………………………              35,000            470,000

4. Improvements to Wards 13, 103, 203 and 303                                     50,000

5. Utility Line Improvements………………….                                         75,000

6. Waterproof Exterior of Certain Buildings….                                          70,000

7. Air Condition and Renovate Hoey Building                                           410,000

8. Air Condition Certain Buildings……………                                        400,000

9. Improvements and Air Conditioning of

Wards 14, 104, 204, 304 and Dining Room Corridor

Building and Air Conditioning…………….                 480,000

Movable Equipment…………………………              30,000           510,000

10. Dobbin Infirmary Improvements……………                                        50,000

 

Broughton Hospital…………………………………                                                          769,000

1. Elevator for Ward 30 and 31 Building.                                                   75,000

2. Alterations and Additions to Jones Building

Building………………………………………            75,000

Fixed Equipment…………………………….              50,000            125,000

3. Convert Farm Colony Building to

Vocational Rehabilitation Domiciliary Unit

Building………………………………………           435,000

Movable Equipment………………………….             15,000

                                                                                             450,000

Less Federal Funds……………………………         337,500           112,500

4. Repaint Water Tank……………………………                                     7,500

5. Improve Trash Collection…………………….                                       36,000

6. Improvement to Underground

Electrical Distribution System…………………                                   $ 50,000

7. New Lighting for Dining Rooms and

Food Preparation and Serving Areas………….                                     12,000

8. New Windows, Lights and Rewiring—

Center Section — Center Building

Renovations……………………………………       $ 200,000

Movable Equipment………………………….                  6,000         206,000

9. New Furnaces for 120 Residences…………….                                  145,000

 

Western Carolina Center…………………………….                                                      $ 906,500

1. Two Playgrounds with Toilets and Shelter

Buildings………………………………………            30,000

Equipment…………………………………….             10,000            40,000

2. Improve Trash Collection…………………….                                     16,500

3. Air Condition Four "H" Buildings……………                                      150,000

4. Sheltered Workshop Addition

Building……………………………………….          224,000

Movable Equipment………………………….             15,000

                                                                                   239,000

Less Federal Funds……………………………         179,000             60,000

5. Emergency Generating Equipment……………                                      25,000

6. Infants Treatment Unit

Building……………………………………….          540,000

Movable Equipment………………………….             75,000           615,000

 

Cherry Hospital                                                                                                                 3,280,000

1. Air Condition Linville Building……………….                                       40,000

2. Furnishings for Quarters for 1000

Patients…………………………………………                               140,000

3. Minor Repairs to Richardson, Jones,

Purser and C.I. Buildings………………………                                 100,000

4. Renovate Woodard Building

Building………………………………………         1,010,000

Fixed Equipment………………………………            20,000

Movable Equipment………………………….               35,000        1,065,000

5. Therapeutic Center Building………………….            785,000

Fixed Equipment………………………………           25,000

Movable Equipment………………………….             75,000             885,000

6. Renovate U-Shaped Patients

Dormitory

Building………………………………………         1,000,000

Fixed Equipment…………………………….               20,000

Movable Equipment…………………………                30,000        1,050,000

 

O'Berry Center                                                                                                                    325,000

1. Air Condition Two "B" Type

Dormitories………………………………….             300,000

2. Security Fence……………………………….               25,000

 

John Umstead Hospital…………………………….                                                            465,000

1. Alteration to Electrical

Distribution System…………………………                                    $ 175,000

2. Air Condition Buildings 52, 56,

57, 62 and 64…………………………………                                   250,000

3. Division of large Ward Areas

into One, Two and Three Bed Areas…………                                      40,000

 

Murdoch Center                                                                                                               $ 662,000

1. Alterations to Infirmary………………………

Building………………………………………            $ 50,000

Equipment……………………………………               12,000            62,000

2. Renovate HTHW Distribution

System — Phase I……………………………                                    300,000

3. Air Condition Cottages………………………                                      300,000

 

Caswell Center………………………………………                                                        770,000

1. Air Condition McNairy Building……………                                          60,000

2. Air Condition Crippled Children's

Hospital #3 and #4………………………….                                      125,000

3. Air Condition 16 Units —

Colony Buildings……………………………                                       300,000

4. Central Garage for Storing Trucks……………                                       37,000

5. Renovate 8 Cottage Buildings

for Children………………………………….                                       40,000

6. Replace Steam, Condensate, Hot

and Cold Water Lines……………………….                                      170,000

7. Fifteen Shade Areas for Play

Courts at Colony Buildings…………………                                         20,000

8. New Deep Well………………………………                                      18,000

 

North Carolina Orthopedic Hospital……………….                                                              30,000

1. Addition to Business Office

Building………………………………………               23,500

Movable Equipment………………………….                  6,500            30,000

 

Western North Carolina Sanatorium……………….                                                            240,000

1. Alterations to Power Plant

and Boiler Replacement………………………                                    240,000

 

IX. NATURAL RESOURCES AND RECREATION

 

Department of Conservation and Development                                                                  1,405,500

 

Division of Travel and Promotion:

1. Two Tourist Welcome Centers

Buildings………………………………….                   184,000

Movable Equipment………………………                     20,000          204,000

 

Division of Commercial and

Sports Fisheries:

1. Complete Concrete Dock —

Morehead City…………………………….                                          55,000

2. Administration Building —

Morehead City

Building………………………………….                     305,000

Fixed Equipment………………………….                  $ 35,000

Movable Equipment………………………                      20,000      $ 360,000

3. 50-Foot Patrol Boat……………………….                                          70,000

4. Office Building — Southport

Building and Equipment…………………                                              21,000

 

Division of Forestry:

1. Relocate Lookout Tower —

Roaring Gap………………………………                                          20,000

2. Mountain Facility — Avery County

Buildings………………………………….                   117,000

Equipment………………………………..                       40,000         157,000

 

Division of State Parks:

1. Bulkheads and Boardwalks

Fort Macon State Park……………………                     75,000

Less Federal Funds……………………….                      37,500          37,500

2. Water Supply Improvements —

Overlook Area

Morrow Mountain State Park                                            28,000

Less Federal Funds………………………                       14,000          14,000

3. Central Water System

Duke Power State Park………………….                       85,000

Less Federal Funds………………………                       42,500          42,500

4. Enlarge Water Supply System

Pettigrew State Park…………………….                        12,000

Less Federal Funds………………………                         6,000            6,000

5. Renovate Swimming Pool

and Bathhouse

Morrow Mountain State Park

Renovations…………………………….                         55,000

Less Federal Funds………………………                       27,500          27,500

6. Road Improvements

Morrow Mountain State Park

Roads………………………………….                          32,000

Less Federal Funds…………………….                          16,000          16,000

7. General Development

Pilot Mountain State Park

Development………………………….                         250,000

Less Federal Funds……………………                        125,000           125,000

8. General Development

Stone Mountain State Park

Development………………………….                         250,000

Less Federal Funds……………………                        125,000           125,000

9. General Development

Snow's Cut State Park Development….                         250,000

Less Federal Funds…………………….                       125,000           125,000

 

Kerr Reservoir Development Commission….                                                                      $ 64,000

1. Elevated Water Tank and Well

Kimball Point…………………………                           $ 8,000

Less Federal Funds……………………                            4,000           $ 4,000

2. Warehouse — Satterwhite Point………                                                   13,000

3. Concession Stand — Kimball Point….                             12,000

Less Federal Funds……………………                           6,000               6,000

4. 20 Tent and Trailer Sites —

Kimball Point…………………………                           22,500

Less Federal Funds……………………                         11,250             11,250

5. 20 New Camp Sites —

Hibernia Park…………………………                            7,500

Less Federal Funds……………………                           3,750               3,750

6. Toilet Building —

Hibernia Park…………………………                            7,000

Less Federal Funds……………………                           3,500               3,500

7. Ranger Residence —

Nutbush Bridge………………………                                                   15,000

8. 300 Picnic Tables —

All Areas………………………………                         10,000

Less Federal Funds……………………                           5,000                5,000

9. Playground Equipment — All Areas…                               5,000

Less Federal Funds……………………                           2,500                 2,500

 

Department of Water and Air Resources…….                                                                  1,000,000

1. Matching Funds for Water

Resources Development Projects………                 10,000,000

Less Federal and Local Funds………….                   9,000,000         1,000,000

 

X. AGRICULTURE

 

Department of Agriculture……………………                                                                    612,000

1. Repairs to Dorton Arena……………….                                                100,000

2. Livestock and Poultry Disease

Diagnostic Laboratory

Building……………………………….                       378,000

Fixed Equipment………………………                        84,000

Movable Equipment……………………                        50,000             512,000

 

Agricultural Experiment Station —

North Carolina State University………………                                                                    619,500

1. Greenhouses — Kent Road Sites……….                                               575,000

2. Swine Facility —

Central Crops Research Station

Building……………………………….                         40,000

Fixed Equipment………………………                          2,000

Movable Equipment………………….                            2,500               44,500

Sec. 5.  There is hereby appropriated out of the Highway Fund the sum of one million eighty thousand dollars ($1,080,000.00) for the use of the Department of Motor Vehicles and State Highway Commission to provide for CAPITAL IMPROVEMENT projects according to the following schedule:

 

II. PUBLIC SAFETY AND REGULATION

 

Department of Motor Vehicles………………                                                                  $ 230,000

1. Garage for Troop "C"

Headquarters

Raleigh

Building……………………………….                       $ 80,000

Equipment                                                                       25,000          $ 105,000

2. Office Building — Roxboro

Building Complete……………………                          119,000

Land…………………………………                            6,000          125,000

 

VI. HIGHWAYS

 

Highway Commission……………………….                                                                      850,000

1. Reserve for Capital

Improvement Projects…………………                                                  850,000

Sec. 6.  There is hereby appropriated out of the Wildlife Resources Fund the sum of one hundred forty thousand dollars ($140,000.00) to provide for CAPITAL IMPROVEMENT projects according to the following schedule:

 

IX. NATURAL RESOURCES AND RECREATION

 

Wildlife Resources Commission………………                                                                    140,000

1. Construction and Development of Boating

Access Areas……………………………                                                40,000

2. Purchase of Land for Wildlife Management

Areas……………………………………                                                50,000

3. Purchase of Boating and Fishing

Access Areas…………………………….                                               20,000

4. Concrete Dam — Intake Structure and Water

Line for Basin Creek — U.S. Park Service Land,

Wilkes County………………………….                                                 30,000

Sec. 7.  The Director of the Budget is authorized and empowered to make transfers and changes from completed projects for which appropriations are made in this Act, within the amounts of appropriations made to each separately named department, agency, or institution, to provide changes as necessary to permit completion of the projects as described in this appropriation and only as detailed in Vol. III of the Budget. Funds may not be transferred from the appropriations herein made to projects authorized by previous or future North Carolina General Assemblies.

Sec. 8.  The Governor and the Advisory Budget Commission are authorized and empowered to delete any CAPITAL IMPROVEMENT project or projects as provided in this Act and substitute therefor any other CAPITAL IMPROVEMENT project or projects which on the request of the department, agency or institution, and in the opinion of the Governor and the Advisory Budget Commission, shall be deemed to be in the best interest of the State. Such substituted projects shall take precedence over projects enumerated in this Act within the limit of funds provided to the requesting department, agency, or institution in this appropriation.

Sec. 9.  The Advisory Budget Commission may, when in its opinion it is in the best interest of the State to do so, and upon the request of the department, institution, or agency, authorize the increase or decrease in size and scope of any project or projects enumerated in this Act within the funds provided in this appropriation to that department, agency or institution.

Sec. 10.  It shall be incumbent upon each agency, department or institution enumerated in this Act to apply for Federal Aid to participate in the construction of each project appropriated for in this Act and to the extent to which projects may be eligible for such Federal aid. Participating Federal funds shall not be used for the purpose of enlarging any project enumerated in this Act beyond the physical or functional scope provided for in this Act and as detailed in Volume III of the Budget but shall replace State funds in the same amount as such Federal aid. The State funds so replaced by Federal funds shall be placed into a special Capital Construction Reserve Fund which fund shall be used at the discretion of the Governor and Advisory Budget Commission for the purpose of providing funds to construct additional facilities which in the opinion of the Governor and Advisory Budget Commission are considered essential subject to availability of funds. Projects so selected by the Governor and the Advisory Budget Commission for construction from the special Capital Construction Reserve Fund shall be as detailed in Volume III of the Budget. In order that the Capital Construction Reserve Fund be used to its fullest benefit to the State, the Advisory Budget Commission, and the Department of Administration, and its pertinent division, shall be furnished in advance with copies of all requests for Federal funds, and this information furnished shall be kept current. Application for use of funds from the special Capital Construction Reserve Fund for additional projects will not be considered until and unless sufficient funds to cover full cost of design, construction, and equipment exist within the special Capital Construction Reserve Fund. Applications in anticipation of these funds will not be considered.

Sec. 11.  There is provided in Section 4 of this Act the sum of one million eight hundred twenty-five thousand dollars (1,825,000.00) appropriated to the Department of Administration for the purpose of providing certain air conditioning and renovation for the four (4) units of the Sanatorium System. These funds shall be allocated and expended as determined by the Governor and the Advisory Budget Commission for the purposes intended and based upon the ultimate use of these facilities.

Sec. 12.  The construction, equipping and furnishing of a new State Art Museum Building, together with the acquisition of a site for the same, is hereby authorized. The appropriation for said purposes of ten million dollars ($10,000,000) is also hereby authorized pursuant to the provisions of Chapter 1142 of the Session Laws of 1967, as amended. There is appropriated the sum of three million dollars (3,000,000) as set forth in Section 4 of this Act to the Department of Administration to be used with funds received from other sources for the construction of said new Museum of Art Building herein authorized. It is the intent of the General Assembly of North Carolina that this appropriation of three million dollars (3,000,000) shall be reserved and used with funds received from private gifts and grants and from other non‑state funds made available by individuals, corporations, foundations and others to provide for the design, construction, furnishing, and all related costs in constructing, equipping and furnishing an Art Museum Building and acquiring a site therefor as authorized by said Chapter 1142 of the Session Laws of 1967, to be used as requested by the State Art Museum Building Commission and shall be subject to the approval of the Governor and the Advisory Budget Commission. The provisions of this Act relative to reversion shall not be applicable to this appropriation.

Sec. 13.  There is provided in Section 4 of this Act the sum of ten million eighty-one thousand nine hundred twenty one dollars (10,081,921.00) appropriated to the University of North Carolina at Chapel Hill for the purpose of providing the State's share of the total cost to construct and equip a Preclinical Education Facility, a Clinical Science Facility and a Bed Tower Addition to Memorial Hospital, each of these facilities being appropriated as detailed in Section 4 of this Act. The funds so appropriated shall be contingent upon matching funds indicated to be provided by the Federal Government for each of these three projects. In the event that Federal funds are not forthcoming, then the funds appropriated in this Act for either or all of the three enumerated projects not receiving Federal support as indicated in Section 4 of this Act shall revert to the General Fund, and shall not be used for any other purpose.

Sec. 14.  Subject to any transfers and changes between appropriations as permitted in Sections 7, 8 and 9 of this Act, the appropriations for CAPITAL IMPROVEMENT made in this Act shall be expended only for specific projects set out in this Act. Construction of all CAPITAL IMPROVEMENT projects enumerated in this Act shall be commenced on or before December 31. 1970; if construction on such project or projects has not been commenced on or before December 31, 1970, then the appropriation for such project or projects shall revert to the original source and no transfer to other projects shall be allowed; provided, however, that subject to the approval of the Governor and the Advisory Budget Commission this deadline may be extended when such action is justified in the opinion of the Governor and the Advisory Budget Commission by existing circumstances and conditions.

Sec. 15.  Any unencumbered balances remaining in the CAPITAL IMPROVEMENT funds of 1967 appropriated for construction and equipment shall revert to the original source on December 31, 1969; provided, that the Governor and the Advisory Budget Commission may grant further extension for specific projects in such cases wherein a real emergency exists.

Sec. 16.  The several departments, institutions, and agencies of the State are fully authorized and empowered to make application or applications to any agency or agencies of the United States of America for grant-in-aid for the construction of the several projects mentioned in this Act and within the scope and intent of the projects enumerated in this Act and to expend the same in accordance with the terms of such grants which are not contrary to the laws of this State. The Advisory Budget Commission and the Department of Administration, and its pertinent divisions, shall be furnished in advance with copies of all requests for Federal funds and this information shall be kept current.

Sec. 17.  All laws and clauses of laws in conflict with this Act are hereby repealed.

Sec. 18.  This Act shall be in full force and effect July 1, 1969.

In the General Assembly read three times and ratified, this the 11th day of June, 1969.