S582 - North Carolina Farm Act of 2023. (SL 2023-63)
Session Year 2023
Section 17 of S.L. 2023-63 provides that Accepted system approvals would be limited to the manufacturer who submitted the petition and received Accepted status and the Commission, DHHS, or local health department cannot condition, delay, or deny the approval based on the location of nitrification lines. The section also removes the Commission's authority to designate nonproprietary wastewater systems as Accepted without a manufacturer petition, and prohibits the Commission or DHHS from conditioning, delaying, or denying the approval of a subsurface trench dispersal product based on a non-native backfill material requirement without prior approval of the manufacturer. A technical change was made in Section 10 of S.L. 2023-90, enacted after this act became law, that corrected a mistaken reference to the "Department" instead of the "Commission."
This bill was vetoed by the Governor on June 23, 2023, and that veto was overridden by the General Assembly on June 27, 2023.
This section became effective June 27, 2023, and applies retroactively to any wastewater system approvals issued by the Commission or DHHS.
Additional Information: